Follow the latest coverage, related explainers and connected technology stories.
Michael Barnard argues that the ARES test in Nevada demonstrated the system’s ability to move massive loads, but also revealed the low density of stored energy relative to the amount of equipment required. The article contends that turning the concept into a 20-megawatt system operating for 20 hours would impose major construction and operational challenges when compared with pumped-hydro storage and batteries.